RING MAN UNITS


The criteria for the connection of large electrical loads are detailed in Imperial
College Technical Policy Statement E4 and for the separation requirements of
LV switchboards in Technical Policy Statement E5. This Technical Policy
Statement sets out the technical requirements for the College's main electrical
distribution equipment and includes interface and protection arrangements


2.0 HV Switchgear
Overview
Multi-panel switchboards or ring main units (RMUs) control the College's
6.6kV and 11kV networks. Both networks are connected as ring circuits but
operate as radial feeds. Each ring has a third feeder coupled, where
possible, at a node representing one half of the total ring current. The
distribution feeders are protected against over-current and earth faults at the
main switchboards and do not rely on intermediate downstream protection.
Therefore, incoming circuits on intermediate switchgear panels are not
equipped with protection relays and are used for manual sectionalising only.
This replicates the function of the ring switches on RMUs.
Multi-panel switchboards are used in substations where a third feeder
interconnection is made and/or other switched HV functions are required
e.g. PFC Capacitors and remotely switched transformer feeders.
RMUs are used in substations utilizing plain transformer feeders and offer
cost and possible space savings over multi-panel switchboards. Further
savings are made if the RMUs can be close coupled to the transformers and
some substations within Imperial College are equipped with up to 3 x
1600kVA transformers connected in this way.

2.1 HV Multi-panel Switchboards
These shall be procured from Imperial College Framework Agreement
Manufacturers and incorporate the following:
• 12kV minimum rms working voltage
• 630A minimum circuit breaker and bus-bar rating
• 25kA – 3s symmetrical fault rating
• Micom P121 or Sepam1000 protection device on transformer
feeders only. Device equipped with auxiliary relays to receive LV
intertrip and lockout signals.
• Vacuum breaking medium
• Bus-section circuit breaker
• All circuit breakers to be independent manual closing control and
fitted with 30V DC trip coil for local manual and protection trips
• All circuit breakers to have lockable electrical trip control switches
• One set of auxiliary contacts shall be wired out on the transformer
panels to provide an inter-trip signal to the transformer LV circuit
breaker, which also acts as an interlock to prevent closure of the LV
circuit breaker until the HV circuit breaker is closed.

2.2 HV Ring Main Units (RMUs)
These shall be procured from Imperial College Framework Agreement
Manufacturers and incorporate the following:
• Through symmetrical fault rating 25kA 3s
• Independent manual ring switch operation with minimum 630A
rating for load switching and through fault making capacity.
• 200A rated vacuum or SF6 circuit breaker for controlling outgoing
transformer feeder.
• Circuit breaker symmetrical breaking capacity of 21kA 1s
• Non-TLF protection e.g. Schneider VIP 300 unit or discrete relay as
in 2.1
• 30V DC shunt trip coil
• One set of auxiliary contacts shall be wired out on the transformer
panels to provide an inter-trip signal to the transformer LV circuit
breaker, which also acts as an interlock to prevent closure of the LV
circuit breaker until the HV circuit breaker is closed
• Suitable for close coupling to the transformer. Close coupled RMUs to
have ground braced framework and not rely on the transformer LV
flange for sole support.

3.0 Transformers
These shall be procured from Imperial College Framework Agreement
Manufacturers and be as follows:
• KNAN Midel liquid cooled type
• Nominally 11/0.433kV but if operated from the Imperial College
6.6kV network 11/6.6/0.433kV dual ratio.
• Vector Group Dyn11
• Suitable for mounting close coupled RMU
The following shall be fitted:
• Liquid Temperature Gauge with maximum temperature indicator
and alarm and trip contacts
• Pressure relief device with trip contacts
• Marshalling cubicle for accessory small wiring
• Off-circuit HV tappings at ± 2.5% and ± 5% with lockable switch
• Transformers in excess of 1600kVA, LV bus-bar flanges for
coupling bus-bar ducting
In exceptional circumstances it may be desirable to install cast resin
transformers with the following fittings:
• Nominally 11/0.433kV but if operated from the Imperial College
6.6kV network 11/6.6/0.433kV dual ratio.
• Vector Group Dyn11
• Thermocouple winding temperature system with 2
thermocouples/winding and monitoring module providing
temperature indication, alarm and trip signals
• IP23 enclosure. The IP index may be reduced if AN cooling
cannot be achieved but clearances to live conductors must be such
to comply with the IP standard "finger" test. Forced cooling of the
enclosures shall be avoided
• Access to core and windings shall be limited by either a) interlocked
doors with keys released by both HV and LV circuit breakers or b)
removable panels with fastenings operated with special tools
• Off-circuit HV tappings at ± 2.5% and ± 5% by means of bolted
links
• Transformers in excess of 1600kVA, LV bus-bar flanges for
coupling bus-bar ducting

4.0 LV Switchgear
These shall be procured from Imperial College Framework Agreement
Manufacturers. Switchboards shall be of Form 4 Type 7 construction in
accordance with Imperial College Technical Policy Statement E5 and
incorporate the following:
• Air Circuit Breakers (ACBs) on all incoming and bus-section
switches. The incoming ACBs to be equipped with Alstom P121
relays and, if transformer incomers, they shall have facility for
restricted earth fault (REF), trip lockout with contacts to intertrip HV
circuit breaker and auxiliary relays to accept trip and alarm signals
from the transformer liquid temperature device and trip signal from
the over-pressure device and, separately, trip receive from HV
circuit breaker.
• Incoming panels and outgoing circuits rated 50kW or greater, including
spares, shall have Socomec meters equipped with RS 485 Comms
output modules only. Socomec A40 meters shall be used for the
incoming circuits and Socomec A20 meters used for the output circuits.
The RS 485 outputs shall be "daisy chained" using screened twisted
pair & drain wire cable (Beldan or equivalent) and terminated in a
separate marshalling cubicle. The number of output networks to be
used, compatible with the College Trend System will be advised by the
College Engineering Team but no more than 31 instruments shall be
linked together
• Meters on sub-distribution panels supplied from switchboards
described above shall be equipped similarly, except the incoming
meter shall be omitted.
• No protection or metering required on bus-section breakers
• A separate cubicle shall be provided for the termination of all
metering outputs and external control circuits. Safe access shall be
possible with the switchboard live
• At the South Kensington Campus incoming and bus-section circuit
breakers shall not be interlocked. At remote campuses LV interlocking
is at the discretion of the HV network owner.
• Outgoing switches up to and including 630A shall be fuse-switch
type
• 30V DC auxiliary supply (shared with HV equipment)
• Outgoing switches equal to or greater 800A shall preferably be ACB
type However, switches in the range 800A – 1250A can be MCCB type
if it can be shown that discrimination can be achieved with downstream
devices
• Preferred switches are of Schneider manufacture

5.0 Cable Systems
HV Cable
• XLPE, Cu, SWA with LS0H oversheath, sized 240mm² for all main
feeders and 95mm² for all transformer feeders, except when close
RMU coupled.
• Cleated to ladder rack and not tie wrapped.
LV Cable & Conductor Systems
• XLPE, Cu, SWA with LS0H oversheath, multicore
• XLPE, Cu, AWA with LS0H oversheath, 1c for transformer incomers
equal to or less than1600kVA
• Transformer incomers > 1600kVA to be connected by bus-bar
trunking
• Cables to be cleated to ladder rack or tray. Tie-wraps may used on
earth conductors or cables, 50 mm² or smaller only

6.0 Auxiliary Equipment
Battery & Charger
• 30V DC with charger failure alarm for remote signalling. (BMS)
Substation Cooling
• Preferably is air natural. If forced air is required is naturally vented
input and forced output.
• Temperature alarm required for remote signalling. (BMS)

7.0 Earthing
This section shall be read in conjunction with Technical Policy Statement E7 –
Earthing Requirements.
Wall mounted main earth bar to be provided. If immediate ground access is
available two earth electrodes are to be provided with target earth resistance
of 10 ohms each. The following bonding shall be made at all South
Kensington substations:
• Panel HV switchgear, one bond at each end
• RMU, one bond. This may be to transformer if close coupled
• Transformers 2. One on each lug or boss
• LV Switchgear, one bond at each bus-bar section
• LV Neutral Earth within switchboard to main earth bar via
removable links. One link for each transformer incomer.
• Incoming HV cable armour. One bond per cable
• All outgoing cable earth conductors bonded to main switchboard
earth bar
For other Imperial College campuses the requirements of the local electricity
operator shall be adhered to. Where LV earths are the responsibility of
Imperial College, then earth electrodes less than or equal to1 ohm shall be
provided and permission to bond to the HV earth sought from the electricity
operator.
RELATED DOCUMENTS :
E4 – Connection of large electrical loads
E5 – Separation form for LV switchgear
E7 – Earthing
 Growing in the electrical feld is shocking

Since it is not posible to draw the schematic, I am trying to gove you the required detail by giving you an expample:-

1 Suppose you want to feed 11 kv power to number of CSS/ OR Transfomers, for example 4 nos of 1250 KVA CSS 11kv/415v. 

2. Than you can do this by selecting 2 Nos of out going feedeers from 11 kv distribution breaker panel with 2 Nos of required size of 3 c 11 kv cable.

3. Th efirst feeder cable to terminate RMU -1 (RMU one incoming breaker / isolator / Load break switch as per application of load) wioth two numbers of Out going breakers/ isolators/ load break switch as per the application of load.

4. Out of two out going of RMU one is connected to CSS-1 

5. Other Out going of RMU to incoming of RMU -2

6. Same way Out going of RMU-1 to CSS -2 and Other out going feeder to RMU-3

7. From RMU -3 out going 1 to CSS-3 and outher out going feeder to RMU-4 out going

8. RMU - 4 will receive incoming from 2nd feeder of 11 KV out going distribution panel.

9. RMU -4 out going one will recive cable from RMU -3 and RMU -4 other out going feeder to CSS-4